Installation Services:
Industrial On-site Installation

Mezz-Rack Systems use their own construction engineers for the installation of Projects or Small Contracts. All personnel including nominated Sub-Contractors - when used - are fully equipped with up to date installation equipment and are familiar with Health and Safety Regulations and C.D.M Site Management regulations. Two to three members of each team have current Fork Lift and Scissor Lift Licenses.
Our installation teams can work in conjunction with the supply of our equipment or simply contracted out directly to you the client.
MEZZ-RACK SYSTEMS
The following photographs show our teams in action. On occasions we have had to respect our clients' confidentiality and not submit certain photographs that may confirm their identity.
(Mobile Racking Installation – Northumberland please refer to case studies)
Phase 1: Design, supply and install new mobile bases and racking.
Phase 2: Dismantle existing bases from building A and transfer to building B, install with new racking.
Phase 3: Design, supply and install static pallet racking in same warehouse.
Phase 1:
Design, supply and install new mobile bases and racking
Tracks already laid and levelled, concrete floor has been allowed time to set.
![]() |
![]() |
![]() |
| Bases are laid out in preparation for assembly | Bases are adjusted to be central to running rails | Rack frames are assembled ready for installation |
Due to client confidentiality we have been requested not to show the actual racking installation due to their name on certain stock items
![]() |
![]() |
![]() |
| Discussing the lighting installation before the racking is installed | Racking is installed along with lower level mesh panels fixed to the back of the racks | The higher level mesh panels are next using scissor lift for speed and in particularly - safety |
![]() |
![]() |
![]() |
| Mesh panels completed | Bespoke cylinder shelving fitted | Racks loaded to full capacity |
Phase 2:
Dismantle existing bases from building A
and transfer to building B, install with new racking
![]() |
![]() |
![]() |
| Existing racking has to be dismantled | 500 Boards have to be removed banded and stacked uniformly for transporting away | Existing bases have been lifted on to bogies and transported to new are ready for assembly and alignment |
Again due to client confidentiality we have been requested not to show the actual racking installation due to their name on certain stock items
![]() |
![]() |
![]() |
| Mesh panels fitted to back of racks teams | Control boxes are wired ready for fitting | One of our hard working teams, smiling and ready for more |
![]() |
![]() |
| Housekeeping required – cleaning the racks before official handover | Phase 2 complete |
Phase 3:
Design, supply and install static pallet racking in same warehouse
Again due to client confidentiality we have been requested not to show the actual racking installation due to their name on certain stock items
![]() |
![]() |
![]() |
| The above photos show the completed result of Phase 3 Static Pallet Racking | ||
![]() |
![]() |
![]() |
| The above images show the final result of a very complex installation - Please refer to Case Studies |
||
2 tier archive storage installation - Newcastle upon Tyne
(Please refer to Case Studies)
![]() |
![]() |
![]() |
| Materials arrive – ready to off-load |
Assembling frames ready for Installation | Assembly of higher beam levels using scissors lift |
![]() |
![]() |
![]() |
| Assembly of lower beam levels | Lower level chipboard shelves fitted |
Accurate spacing of timber joists for supporting chipboard floor |
![]() |
![]() |
![]() |
| Timber joists set at 600mm centres cleated uniformly to beams |
Side elevation of timber joists over the beams and through the racking | Timber joists set up to the wall to allow tight fit of decking to the wall |
![]() |
![]() |
![]() |
| View of timber floor through side aisles |
View of timber floor through main walkways | MDF Lateral ties have been notched around beam bracket to prevent small files from sliding between shelf and frame |
![]() |
![]() |
![]() |
| Lighting connected to underside of Mezzanine |
Lighting to both levels with mesh panels fitted to upper perimeter edge | All decking cuts around the frames have been carefully hidden with MDF plinths |
Other Installation Images
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
All shelving and racking systems - mezzanine floors - office partitions - fit-outs - projects / installations, large or small are carried out by our own experienced and efficient installation engineers.
By offering a multi product, turn key service Mezz-Rack Systems could well be the only Storage Equipment Company that you may ever need.
Mezz-Rack Systems are specialists in the design, supply and installation of storage systems, please refer to our /consultation & advice section if you require or are looking for a complete project design, procurement, installation and projects management package.
Please contact us with your requirements.
| Installation | ||
| Industrial On-site Installation | Office Fit Outs | Supplier Contracting |












































